4. Frame. The whole of the foul drainage, shown by red dotted lines on Plan, is to be executed with glazed stoneware tubular drain pipes with socketed and spigot joints, footed on concrete, the faints being kept clean and flush with the inside : at intervals.
Boiler flue pipes or other similar pipe to be inserted so as to allow the drains to be examined without interfering with their continuity. All drains to be carefully and finally bedded, laid with proper falls and with all necessary bends, junctions, and the like. All soil pipes to be trapped at the point where they leave the buildings.
6 syphons, the Elbows and junctions with the main sewer to be well and carefully made (note ...). If the work is performed by Contract a special clause should be inserted with Tender etc. relating that the contractor shall give notice to the Superintending Officer when any (such as foundations etc.) is ready to be covered in, so that the Officer may satisfy himself that the work has been properly executed before filling in.
Only work to be done in this manner : in case of non-compliance with this clause, the Contractor should be bound to uncover the works at his own cost.
4) Rain water drains. The drains for Rainwater are to be laid as shown on Plan and with materials and workmanship as described for foul drains. The carried Waste pipes from all cisterns are to discharge into the rain water drains and not into the foul drains, and the rain water drains are ...
4. Frame. The whole of the foul desine, shown by red dotted lives on Plom to lau to be sxecuted with played &tmewan tubular dram peper with backed joints, footed cunent, the faints being kept clean cond fluch
the inside : at intusals
Bofshme
au
ኤ
Thom 10ft, achin and suddle or other similar pipe tobe inserted to as trallow the drams to be farminced withank interfering tack thin continuity. All drams the carefully and finaly bedded, laid ofperfer falls and with all necessary bende,
6 syphews, the Elbows and finition. All sail piper to be truffed at the finto to here they leave the buildings
he
and the
functions with the mam theeh tewees
>
au to be well and
53
caufully made (hote ._. If the cork is performed by Contact a
fecial clause should be incuted with Tennes ete prelating that the contractor shell qui cuten & the Superintending Officer to her aucy modepromed work in ros ( kuchas foundations adeam) is readyble ready to be covered in, to that the offer may
satrify himself that the conk herben forfulg
Encuested before filling
anly auty to be done
in is commenced, which in nder : in case of non
by bim na
овнити
of this clarese, the Contractar should be borned to incover the works at his aun
Costs)
4)
& Pain water dixins. _ the drami for Enmiwatu are to the laid as shewn in blentine
m
1
Plom hot and with matinals and
torrkmanship as deniibed for fact drains.
the carried Waste pipes from all cisterns are
into the ram water drains and not into the
faul drains and the ram wath drains are