4. Frame. The whole of the foul drainage, shown by red dotted lines on Plan, is to be executed with glazed stoneware tubular drain pipes with socketed and spigot joints, footed on concrete, the faints being kept clean and flush with the inside : at intervals.

Boiler flue pipes or other similar pipe to be inserted so as to allow the drains to be examined without interfering with their continuity. All drains to be carefully and finally bedded, laid with proper falls and with all necessary bends, junctions, and the like. All soil pipes to be trapped at the point where they leave the buildings.

6 syphons, the Elbows and junctions with the main sewer to be well and carefully made (note ...). If the work is performed by Contract a special clause should be inserted with Tender etc. relating that the contractor shall give notice to the Superintending Officer when any (such as foundations etc.) is ready to be covered in, so that the Officer may satisfy himself that the work has been properly executed before filling in.

Only work to be done in this manner : in case of non-compliance with this clause, the Contractor should be bound to uncover the works at his own cost.

4) Rain water drains. The drains for Rainwater are to be laid as shown on Plan and with materials and workmanship as described for foul drains. The carried Waste pipes from all cisterns are to discharge into the rain water drains and not into the foul drains, and the rain water drains are ...

Edit History

2026-05-21 09:13:59 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
4. Frame. The whole of the foul drainage, shown by red dotted lines on Plan, is to be executed with glazed stoneware tubular drain pipes with socketed and spigot joints, footed on concrete, the faints being kept clean and flush with the inside : at intervals. Boiler flue pipes or other similar pipe to be inserted so as to allow the drains to be examined without interfering with their continuity. All drains to be carefully and finally bedded, laid with proper falls and with all necessary bends, junctions, and the like. All soil pipes to be trapped at the point where they leave the buildings. 6 syphons, the Elbows and junctions with the main sewer to be well and carefully made (note ...). If the work is performed by Contract a special clause should be inserted with Tender etc. relating that the contractor shall give notice to the Superintending Officer when any (such as foundations etc.) is ready to be covered in, so that the Officer may satisfy himself that the work has been properly executed before filling in. Only work to be done in this manner : in case of non-compliance with this clause, the Contractor should be bound to uncover the works at his own cost. 4) Rain water drains. The drains for Rainwater are to be laid as shown on Plan and with materials and workmanship as described for foul drains. The carried Waste pipes from all cisterns are to discharge into the rain water drains and not into the foul drains, and the rain water drains are ...
Baseline (Original)
4. Frame. The whole of the foul desine, shown by red dotted lives on Plom to lau to be sxecuted with played &tmewan tubular dram peper with backed joints, footed cunent, the faints being kept clean cond fluch the inside : at intusals Bofshme au Thom 10ft, achin and suddle or other similar pipe tobe inserted to as trallow the drams to be farminced withank interfering tack thin continuity. All drams the carefully and finaly bedded, laid ofperfer falls and with all necessary bende, 6 syphews, the Elbows and finition. All sail piper to be truffed at the finto to here they leave the buildings he and the functions with the mam theeh tewees > au to be well and 53 caufully made (hote ._. If the cork is performed by Contact a fecial clause should be incuted with Tennes ete prelating that the contractor shell qui cuten & the Superintending Officer to her aucy modepromed work in ros ( kuchas foundations adeam) is readyble ready to be covered in, to that the offer may satrify himself that the conk herben forfulg Encuested before filling anly auty to be done in is commenced, which in nder : in case of non by bim na овнити of this clarese, the Contractar should be borned to incover the works at his aun Costs) 4) & Pain water dixins. _ the drami for Enmiwatu are to the laid as shewn in blentine m 1 Plom hot and with matinals and torrkmanship as deniibed for fact drains. the carried Waste pipes from all cisterns are into the ram water drains and not into the faul drains and the ram wath drains are
2026-05-21 09:13:59 · Baseline
View content

4. Frame. The whole of the foul desine, shown by red dotted lives on Plom to lau to be sxecuted with played &tmewan tubular dram peper with backed joints, footed cunent, the faints being kept clean cond fluch

the inside : at intusals

Bofshme

au

Thom 10ft, achin and suddle or other similar pipe tobe inserted to as trallow the drams to be farminced withank interfering tack thin continuity. All drams the carefully and finaly bedded, laid ofperfer falls and with all necessary bende,

6 syphews, the Elbows and finition. All sail piper to be truffed at the finto to here they leave the buildings

he

and the

functions with the mam theeh tewees

>

au to be well and

53

caufully made (hote ._. If the cork is performed by Contact a

fecial clause should be incuted with Tennes ete prelating that the contractor shell qui cuten & the Superintending Officer to her aucy modepromed work in ros ( kuchas foundations adeam) is readyble ready to be covered in, to that the offer may

satrify himself that the conk herben forfulg

Encuested before filling

anly auty to be done

in is commenced, which in nder : in case of non

by bim na

овнити

of this clarese, the Contractar should be borned to incover the works at his aun

Costs)

4)

& Pain water dixins. _ the drami for Enmiwatu are to the laid as shewn in blentine

m

1

Plom hot and with matinals and

torrkmanship as deniibed for fact drains.

the carried Waste pipes from all cisterns are

into the ram water drains and not into the

faul drains and the ram wath drains are